亚洲精品白浆高清久久久久久,久久鬼色综合88久久,中文字幕大香视频蕉无码,久久99精品久久久久久HB无码

NewsHome > News > Industry dynamics

Secret Record of Maintenance and Maintenance of Grazing Machine
release time:2019-3-28 15:49:00      hit count:1691

Daily pre-start check

1. Check oil and coolant leakage, record tire damage, hose extrusion deformation, bolt loosening or edge wear.

2. Removal of debris, residues and garbage from loose areas of bulldozers or discs

3. Check and ensure that the bulldozer slides and the top surface of the disc are clean.

4. Ensure that the safety signs are clean and in good condition. If damaged, lost or blurred, replace in time.

5. Clean the cockpit glass and check that all rearview mirrors are in place.

6. Before starting the grader, make sure that all the tools and other unfixed items on the machine are clear.

7. Visual inspection of brake fluid level through translucent main cylinder container. The liquid level should be at the flange of the container, not more than 1 inch from the top of the cap.

8. Check once a week or 50 hours of work. The daily pre-startup inspection method should also be used during the inspection.


Previous: Precautions for cement pavement construction: preparation before paving
Next: What if the drill pipe of rotary drilling rig drops slowly?

Back to list

News you are interested in
巴楚县| 镇平县| 依安县| 拜泉县| 大安市| 沁源县| 博爱县| 司法| 高平市| 新乡县| 张家界市| 吐鲁番市| 和平区| 丰台区|